X
Building Construction Costs With RSMeans Data 2020
Building Construction Costs With RSMeans Data 2020

Building Construction Costs With RSMeans Data 2020 (Means Building Construction Cost Data, 78)

Product ID : 42464077
4.5 out of 5 stars


Galleon Product ID 42464077
Shipping Weight 4.41 lbs
I think this is wrong?
Model
Manufacturer Gordian
Shipping Dimension 10.87 x 8.5 x 1.5 inches
I think this is wrong?
-
Save 63%
Before ₱ 29,624
10,959

*Price and Stocks may change without prior notice
*Packaging of actual item may differ from photo shown
  • Electrical items MAY be 110 volts.
  • 7 Day Return Policy
  • All products are genuine and original
  • Cash On Delivery/Cash Upon Pickup Available

Pay with

About Building Construction Costs With RSMeans Data 2020

This data set is aimed primarily at estimating commercial and industrial projects or large multi-family housing projects costing $3,500,000 and up.